Equinor platform benefits from Sulzer pump repair19 March 2021

The original pump cartridge removed for assessment

Offshore oil fields need to optimise productivity to remain profitable, and this often means that water injection pumps are used to increase the speed of oil recovery.

A Norwegian offshore platform needed expert support to repair two pumps. The oil platform has operated two BB5 water injection pumps for over 10 years, but they have suffered from rapid wear and high vibration. The original equipment manufacturer (OEM) had delivered several upgrades but there was little improvement in either performance or reliability. There were also long periods of time when there was no water injection capacity, which had a serious impact on oil recovery rates. To help resolve this, the operators decided to approach Sulzer for a solution.

Equinor, the operator of the platform, has a framework agreement with Sulzer for the repair and modification of pumps. The initial discussions led to an offer to investigate the spare pump cartridge, which had also exhibited the same symptoms of vibration. Sulzer took the cartridge to the Stavanger Service Centre and dismantled it. They discovered that the main shaft had rotodynamic issues, which caused the vibrations, and that this fault had been an issue from new.

To restore the water injection capability of the platform with minimal delay, Sulzer suggested, in the short-term, that the cartridge should be replaced with a hybrid component. This would fit exactly into the existing barrel of the pump on the platform and enable the first pump to operate.

The pump in question was not manufactured by Sulzer, but over the next six months, it manufactured the new hybrid cartridge. Together with the onsite maintenance provider, Sulzer engineers installed and commissioned the water injection pump and returned the platform to normal operations.

In the meantime, Equinor had taken the decision to replace both of the original water injection pumps with new assets designed and manufactured by Sulzer. In Leeds, Sulzer began manufacturing the new injection pumps, which would be installed during separate, planned maintenance windows. The projects were carefully coordinated to ensure the pumps were delivered on time, together with other auxiliary components, to meet the installation program set out by Equinor.

Oddvar Holta, project manager for Sulzer, comments: “The greatest challenge has been the very short delivery time on the hybrid cartridge, which would normally have taken 10 months. We have managed to streamline this process and meet the objectives of our customer, getting the water injection pump up and running on time.”

However, the story did not end there. Having manufactured the new pumps to match the specifications of the original components, and the first one had been installed, a change in site conditions prompted the decision to reduce the operational head of the new pumps to reduce energy consumption and CO2 emissions. This required the pumps to be de-staged, which meant removing four impellers of the original eight in cartridge A and two impellers in cartridge B.

The design engineers in Leeds created the necessary drawings for the transition tubes, which were manufactured at the same site. Once complete, engineers from Sulzer travelled to the platform and removed the impellers that were no longer required and installed the new components. Pump A achieved a power reduction of 2 MW and pump B’s power consumption was reduced by 1 MW.

William Dalrymple

Related Companies
Sulzer Pumps UK Ltd

This material is protected by MA Business copyright
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies contact the sales team.